Weir-Stewart Road over Relief for Bywy Canal
FairChoctaw County, Mississippi · Sec 14 T18N R 8E B · Structure no. SA1000000000050
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected March 2024
- Type
- Channel Beam
- Concrete
- Length
- 95 ft
- 5 main spans
- Daily traffic
- 500
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Weir-Stewart Road over Relief for Bywy Canal is a concrete channel beam carrying Weir-Stewart Road over Relief for Bywy Canal in Choctaw County, Mississippi. It was built in 1989, so it is 36 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 8% of them trucks, projected to reach 625 by 2043. The structure is 95 ft (29 m) long and 24 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Weir-Stewart Road over Relief for Bywy Canal built?
It was built in 1989, making it 36 years old in 2025.
What condition is Weir-Stewart Road over Relief for Bywy Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Weir-Stewart Road over Relief for Bywy Canal carry?
About 500 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Weir-Stewart Road over Relief for Bywy Canal?
The structure is 95 ft (29 m) long with a longest span of 19 ft (5.8 m) and a deck 24 ft wide.
Who owns Weir-Stewart Road over Relief for Bywy Canal?
It is owned by the County Highway Agency.