Dulaney St. over Chico Creek
PoorClosed to trafficChickasaw County, Mississippi · Sec 32 T13S R 3E · Structure no. SA0900000000171
- Built
- 1992
- 33 years old
- Condition
- Poor
- inspected November 2023
- Type
- Channel Beam
- Concrete
- Length
- 38 ft
- 2 main spans
- Daily traffic
- 409
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Dulaney St. over Chico Creek is a concrete channel beam carrying Dulaney St. over Chico Creek in Chickasaw County, Mississippi. It was built in 1992, so it is 33 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 2 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 409 vehicles a day, roughly 8% of them trucks, projected to reach 600 by 2040. The structure is 38 ft (11.6 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dulaney St. over Chico Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is Dulaney St. over Chico Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2023.
How much traffic does Dulaney St. over Chico Creek carry?
About 409 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Dulaney St. over Chico Creek?
The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns Dulaney St. over Chico Creek?
It is owned by the City or Municipal Highway Agency.