US Bridges

Pyland-Thorn RD over Relief

Fair

Chickasaw County, Mississippi · Sec 20 T13S R 2E B · Structure no. SA0900000000038

Built
2004
21 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
27 ft
1 main span
Daily traffic
240
2022 count
Owner
County
County Highway Agency

About this bridge

Pyland-Thorn RD over Relief is a steel stringer/multi-beam or girder carrying Pyland-Thorn RD over Relief in Chickasaw County, Mississippi. It was built in 2004, so it is 21 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 240 vehicles a day, roughly 8% of them trucks, projected to reach 360 by 2044. The structure is 27 ft (8.2 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPyland-Thorn RD
CrossesRelief
LocationSec 20 T13S R 2E B
RouteCounty Highway 1795
Coordinates33.92864, -89.11017
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.7 US tons
Inventory rating29.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length27 ft (8.2 m)
Longest span26 ft (7.8 m)
Deck width25 ft (7.6 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic240 (2022)
Projected traffic360 by 2044
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$238,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Pyland-Thorn RD over Relief built?

It was built in 2004, making it 21 years old in 2025.

What condition is Pyland-Thorn RD over Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Pyland-Thorn RD over Relief carry?

About 240 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Pyland-Thorn RD over Relief?

The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.8 m) and a deck 25 ft wide.

Who owns Pyland-Thorn RD over Relief?

It is owned by the County Highway Agency.