SR 32 over Indian Creek Relief
GoodChickasaw County, Mississippi · 0.8 MI E Calhoun Cl · Structure no. 310003200912600
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 142 ft
- 1 main span
- Daily traffic
- 960
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 32 over Indian Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying SR 32 over Indian Creek Relief in Chickasaw County, Mississippi. It was built in 2007, so it is 18 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 960 vehicles a day, roughly 11% of them trucks, projected to reach 960 by 2043. The structure is 142 ft (43.2 m) long and 43 ft wide. If it were closed, the detour would be 21.1 mi (34 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 32 over Indian Creek Relief built?
It was built in 2007, making it 18 years old in 2025.
What condition is SR 32 over Indian Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does SR 32 over Indian Creek Relief carry?
About 960 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 32 over Indian Creek Relief?
The structure is 142 ft (43.2 m) long with a longest span of 60 ft (18.3 m) and a deck 43 ft wide.
Who owns SR 32 over Indian Creek Relief?
It is owned by the State Highway Agency.