SR 9 over Relief Opening
FairCalhoun County, Mississippi · 1.1 MI S SR 32 · Structure no. 310000900705130
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 201 ft
- 5 main spans
- Daily traffic
- 8,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 9 over Relief Opening is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 9 over Relief Opening in Calhoun County, Mississippi. It was built in 1995, so it is 30 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,000 vehicles a day, roughly 14% of them trucks, projected to reach 8,000 by 2043. The structure is 201 ft (61.3 m) long and 47 ft wide. If it were closed, the detour would be 49.7 mi (80 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 9 over Relief Opening built?
It was built in 1995, making it 30 years old in 2025.
What condition is SR 9 over Relief Opening in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does SR 9 over Relief Opening carry?
About 8,000 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is SR 9 over Relief Opening?
The structure is 201 ft (61.3 m) long with a longest span of 40 ft (12.2 m) and a deck 47 ft wide.
Who owns SR 9 over Relief Opening?
It is owned by the State Highway Agency.