Hiter Road over Snake Creek
GoodBolivar County, Mississippi · Sec 21 T23N R 6W · Structure no. SA060000000A157
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 75
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Hiter Road over Snake Creek is a prestressed concrete stringer/multi-beam or girder carrying Hiter Road over Snake Creek in Bolivar County, Mississippi. It was built in 2018, so it is 7 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 10% of them trucks, projected to reach 112 by 2045. The structure is 122 ft (37.1 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hiter Road over Snake Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is Hiter Road over Snake Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Hiter Road over Snake Creek carry?
About 75 vehicles per day (2025 count), of which roughly 10% are trucks.
How long is Hiter Road over Snake Creek?
The structure is 122 ft (37.1 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.
Who owns Hiter Road over Snake Creek?
It is owned by the County Highway Agency.