Logan Road over Bch of Christmas Lake
FairPosted for loadBolivar County, Mississippi · Sec 23 T22N R 8W · Structure no. SA0600000000134
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 46 ft
- 1 main span
- Daily traffic
- 10
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Logan Road over Bch of Christmas Lake is a steel stringer/multi-beam or girder carrying Logan Road over Bch of Christmas Lake in Bolivar County, Mississippi. It was built in 1996, so it is 29 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, projected to reach 15 by 2034. The structure is 46 ft (14 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Logan Road over Bch of Christmas Lake built?
It was built in 1996, making it 29 years old in 2025.
What condition is Logan Road over Bch of Christmas Lake in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Logan Road over Bch of Christmas Lake carry?
About 10 vehicles per day (2014 count).
How long is Logan Road over Bch of Christmas Lake?
The structure is 46 ft (14 m) long with a longest span of 46 ft (14 m) and a deck 26 ft wide.
Who owns Logan Road over Bch of Christmas Lake?
It is owned by the County Highway Agency.