Powell Road over Relief West Fork Amite R
GoodAmite County, Mississippi · Sec 30 T 1N R 4E B · Structure no. SA030000000A034
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected November 2024
- Type
- Channel Beam
- Concrete
- Length
- 78 ft
- 3 main spans
- Daily traffic
- 75
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Powell Road over Relief West Fork Amite R is a concrete channel beam carrying Powell Road over Relief West Fork Amite R in Amite County, Mississippi. It was built in 2019, so it is 6 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, projected to reach 112 by 2044. The structure is 78 ft (23.8 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Powell Road over Relief West Fork Amite R built?
It was built in 2019, making it 6 years old in 2025.
What condition is Powell Road over Relief West Fork Amite R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Powell Road over Relief West Fork Amite R carry?
About 75 vehicles per day (2022 count).
How long is Powell Road over Relief West Fork Amite R?
The structure is 78 ft (23.8 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.
Who owns Powell Road over Relief West Fork Amite R?
It is owned by the County Highway Agency.