Proper Street over Relief
FairAlcorn County, Mississippi · Sec 7 T 2S R 8E · Structure no. SA0200000000086
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete
- Length
- 69 ft
- 300 main spans
- Daily traffic
- 5,800
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Proper Street over Relief is a concrete slab carrying Proper Street over Relief in Alcorn County, Mississippi. It was built in 1984, so it is 41 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,800 vehicles a day, roughly 15% of them trucks, projected to reach 8,700 by 2045. The structure is 69 ft (21 m) long and 56 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Proper Street over Relief built?
It was built in 1984, making it 41 years old in 2025.
What condition is Proper Street over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Proper Street over Relief carry?
About 5,800 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is Proper Street over Relief?
The structure is 69 ft (21 m) long with a longest span of 23 ft (7 m) and a deck 56 ft wide.
Who owns Proper Street over Relief?
It is owned by the City or Municipal Highway Agency.