Canal Street over Natchez & Southern RR
FairPosted for loadAdams County, Mississippi · Sec 24 T 7N R 3W · Structure no. SA0100000000059
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 9,260
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Canal Street over Natchez & Southern RR is a steel stringer/multi-beam or girder carrying Canal Street over Natchez & Southern RR in Adams County, Mississippi. It was built in 1940, so it is 85 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 9,260 vehicles a day, roughly 8% of them trucks, projected to reach 13,890 by 2033. The structure is 110 ft (33.5 m) long and 57 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Canal Street over Natchez & Southern RR built?
It was built in 1940, making it 85 years old in 2025.
What condition is Canal Street over Natchez & Southern RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Canal Street over Natchez & Southern RR carry?
About 9,260 vehicles per day (2013 count), of which roughly 8% are trucks.
How long is Canal Street over Natchez & Southern RR?
The structure is 110 ft (33.5 m) long with a longest span of 40 ft (12.2 m) and a deck 57 ft wide.
Who owns Canal Street over Natchez & Southern RR?
It is owned by the City or Municipal Highway Agency.