Ewing Ave S over Is 64
GoodSt. Louis city, Missouri · S 22 T 45 N R 7 E · Structure no. 36383
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected July 2023
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 184 ft
- 2 main spans
- Daily traffic
- 3,152
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Ewing Ave S over Is 64 is a prestressed concrete continuous tee beam carrying Ewing Ave S over Is 64 in St. Louis city, Missouri. It was built in 2020, so it is 5 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,152 vehicles a day, roughly 5% of them trucks, projected to reach 4,728 by 2044. The structure is 184 ft (56.2 m) long and 58 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ewing Ave S over Is 64 built?
It was built in 2020, making it 5 years old in 2025.
What condition is Ewing Ave S over Is 64 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Ewing Ave S over Is 64 carry?
About 3,152 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Ewing Ave S over Is 64?
The structure is 184 ft (56.2 m) long with a longest span of 91 ft (27.6 m) and a deck 58 ft wide.
Who owns Ewing Ave S over Is 64?
It is owned by the State Highway Agency.