Tucker Blvd over Trra & UP RR
PoorPosted for loadSt. Louis city, Missouri · S 23 T 45 N R 7 E · Structure no. 13140
- Built
- 1979
- 46 years old
- Condition
- Poor
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,420 ft
- 18 main spans
- Daily traffic
- 21,000
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Tucker Blvd over Trra & UP RR is a steel stringer/multi-beam or girder carrying Tucker Blvd over Trra & UP RR in St. Louis city, Missouri. It was built in 1979, so it is 46 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 21,000 vehicles a day, roughly 5% of them trucks, projected to reach 28,350 by 2043. The structure is 1,420 ft (432.8 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tucker Blvd over Trra & UP RR built?
It was built in 1979, making it 46 years old in 2025.
What condition is Tucker Blvd over Trra & UP RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2024.
How much traffic does Tucker Blvd over Trra & UP RR carry?
About 21,000 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Tucker Blvd over Trra & UP RR?
The structure is 1,420 ft (432.8 m) long with a longest span of 118 ft (36 m) and a deck 80 ft wide.
Who owns Tucker Blvd over Trra & UP RR?
It is owned by the City or Municipal Highway Agency.