Grizzly Trail over Trib W Fk Grand Rv
FairWorth County, Missouri · S 17 T 65 N R 32 W · Structure no. 14802
- Built
- 1900
- 125 years old, rebuilt 1986
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 60 ft
- 2 main spans
- Daily traffic
- 15
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Grizzly Trail over Trib W Fk Grand Rv is a steel continuous stringer/multi-beam or girder carrying Grizzly Trail over Trib W Fk Grand Rv in Worth County, Missouri. It was built in 1900 and reconstructed in 1986, so it is 125 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 17 by 2044. The structure is 60 ft (18.3 m) long and 15 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grizzly Trail over Trib W Fk Grand Rv built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1986.
What condition is Grizzly Trail over Trib W Fk Grand Rv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Grizzly Trail over Trib W Fk Grand Rv carry?
About 15 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Grizzly Trail over Trib W Fk Grand Rv?
The structure is 60 ft (18.3 m) long with a longest span of 39 ft (11.9 m) and a deck 15 ft wide.
Who owns Grizzly Trail over Trib W Fk Grand Rv?
It is owned by the County Highway Agency.