Rt Zz S over Fk of Gasconade Rv
FairWebster County, Missouri · S 29 T 32 N R 16 W · Structure no. 8328
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 347 ft
- 4 main spans
- Daily traffic
- 215
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rt Zz S over Fk of Gasconade Rv is a steel continuous stringer/multi-beam or girder carrying Rt Zz S over Fk of Gasconade Rv in Webster County, Missouri. It was built in 1963, so it is 62 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 215 vehicles a day, roughly 13% of them trucks, projected to reach 344 by 2044. The structure is 347 ft (105.8 m) long and 28 ft wide. If it were closed, the detour would be 26.7 mi (43 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rt Zz S over Fk of Gasconade Rv built?
It was built in 1963, making it 62 years old in 2025.
What condition is Rt Zz S over Fk of Gasconade Rv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Rt Zz S over Fk of Gasconade Rv carry?
About 215 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is Rt Zz S over Fk of Gasconade Rv?
The structure is 347 ft (105.8 m) long with a longest span of 96 ft (29.3 m) and a deck 28 ft wide.
Who owns Rt Zz S over Fk of Gasconade Rv?
It is owned by the State Highway Agency.