US Bridges

Rt a S over US 60

Good

Webster County, Missouri · S 25 T 29 N R 18 W · Structure no. 37508

Built
2025
0 years old
Condition
Good
inspected January 2025
Type
Tee Beam
Prestressed Concrete Continuous
Length
153 ft
2 main spans
Daily traffic
2,868
2024 count
Owner
State
State Highway Agency

About this bridge

Rt a S over US 60 is a prestressed concrete continuous tee beam carrying Rt a S over US 60 in Webster County, Missouri. It was built in 2025, so it is 0 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

It carries about 2,868 vehicles a day, roughly 12% of them trucks, projected to reach 4,589 by 2044. The structure is 153 ft (46.7 m) long and 51 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesRt a S
CrossesUS 60
LocationS 25 T 29 N R 18 W
RouteState Highway 0A
Coordinates37.17212, -92.86362
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.4 US tons
Inventory rating44.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length153 ft (46.7 m)
Longest span77 ft (23.4 m)
Deck width51 ft (15.4 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,868 (2024)
Projected traffic4,589 by 2044
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rt a S over US 60 built?

It was built in 2025, making it 0 years old in 2025.

What condition is Rt a S over US 60 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Rt a S over US 60 carry?

About 2,868 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is Rt a S over US 60?

The structure is 153 ft (46.7 m) long with a longest span of 77 ft (23.4 m) and a deck 51 ft wide.

Who owns Rt a S over US 60?

It is owned by the State Highway Agency.