US Bridges

CR 313 over Rings CR

Good

Wayne County, Missouri · S 20 T 29 N R 5 E · Structure no. 36568

Built
2021
4 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
30
2024 count
Owner
County
County Highway Agency

About this bridge

CR 313 over Rings CR is a prestressed concrete box beam or girders - multiple carrying CR 313 over Rings CR in Wayne County, Missouri. It was built in 2021, so it is 4 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, roughly 10% of them trucks, projected to reach 38 by 2044. The structure is 55 ft (16.8 m) long and 24 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesCR 313
CrossesRings CR
LocationS 20 T 29 N R 5 E
RouteCounty Highway 168
Coordinates37.17832, -90.52467
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.5 US tons
Inventory rating38.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length55 ft (16.8 m)
Longest span53 ft (16.2 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2024)
Projected traffic38 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 313 over Rings CR built?

It was built in 2021, making it 4 years old in 2025.

What condition is CR 313 over Rings CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does CR 313 over Rings CR carry?

About 30 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is CR 313 over Rings CR?

The structure is 55 ft (16.8 m) long with a longest span of 53 ft (16.2 m) and a deck 24 ft wide.

Who owns CR 313 over Rings CR?

It is owned by the County Highway Agency.