Rt W S over Brazil CR
GoodWashington County, Missouri · S 28 T 38 N R 1 W · Structure no. 8361
- Built
- 1963
- 62 years old, rebuilt 2009
- Condition
- Good
- inspected June 2024
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 111 ft
- 3 main spans
- Daily traffic
- 111
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rt W S over Brazil CR is a prestressed concrete continuous tee beam carrying Rt W S over Brazil CR in Washington County, Missouri. It was built in 1963 and reconstructed in 2009, so it is 62 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 111 vehicles a day, roughly 11% of them trucks, projected to reach 155 by 2044. The structure is 111 ft (33.8 m) long and 27 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rt W S over Brazil CR built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2009.
What condition is Rt W S over Brazil CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Rt W S over Brazil CR carry?
About 111 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is Rt W S over Brazil CR?
The structure is 111 ft (33.8 m) long with a longest span of 40 ft (12.3 m) and a deck 27 ft wide.
Who owns Rt W S over Brazil CR?
It is owned by the State Highway Agency.