Dugout RD over Trib to Mineral Fk
GoodWashington County, Missouri · S 2066 T 39 N R 3 E · Structure no. 37295
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 70 ft
- 1 main span
- Daily traffic
- 60
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Dugout RD over Trib to Mineral Fk is a prestressed concrete box beam or girders - single or spread carrying Dugout RD over Trib to Mineral Fk in Washington County, Missouri. It was built in 2024, so it is 1 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.
It carries about 60 vehicles a day, roughly 10% of them trucks, projected to reach 72 by 2044. The structure is 70 ft (21.3 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dugout RD over Trib to Mineral Fk built?
It was built in 2024, making it 1 years old in 2025.
What condition is Dugout RD over Trib to Mineral Fk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Dugout RD over Trib to Mineral Fk carry?
About 60 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Dugout RD over Trib to Mineral Fk?
The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 26 ft wide.
Who owns Dugout RD over Trib to Mineral Fk?
It is owned by the County Highway Agency.