US Bridges

James RD over Trib to Douglas Br

Good

Vernon County, Missouri · S 15 T 36 N R 32 W · Structure no. 36994

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
23 ft
1 main span
Daily traffic
25
2023 count
Owner
County
County Highway Agency

About this bridge

James RD over Trib to Douglas Br is a steel stringer/multi-beam or girder carrying James RD over Trib to Douglas Br in Vernon County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 33 by 2043. The structure is 23 ft (7.1 m) long and 23 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesJames RD
CrossesTrib to Douglas Br
LocationS 15 T 36 N R 32 W
RouteCounty Highway 299
Coordinates37.91121, -94.44928
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83.3 US tons
Inventory rating49.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length23 ft (7.1 m)
Longest span20 ft (6.2 m)
Deck width23 ft (7 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2023)
Projected traffic33 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was James RD over Trib to Douglas Br built?

It was built in 2023, making it 2 years old in 2025.

What condition is James RD over Trib to Douglas Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does James RD over Trib to Douglas Br carry?

About 25 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is James RD over Trib to Douglas Br?

The structure is 23 ft (7.1 m) long with a longest span of 20 ft (6.2 m) and a deck 23 ft wide.

Who owns James RD over Trib to Douglas Br?

It is owned by the County Highway Agency.