US Bridges

Maple ST over Crk

Good

Vernon County, Missouri · S 10 T 35 N R 31 W · Structure no. 36798

Built
2000
25 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
150
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Maple ST over Crk is a concrete continuous culvert carrying Maple ST over Crk in Vernon County, Missouri. It was built in 2000, so it is 25 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 10% of them trucks, projected to reach 203 by 2044. The structure is 25 ft (7.6 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMaple ST
CrossesCrk
LocationS 10 T 35 N R 31 W
RouteCity Street 0
Coordinates37.83362, -94.34544
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span12 ft (3.8 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2024)
Projected traffic203 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Maple ST over Crk built?

It was built in 2000, making it 25 years old in 2025.

What condition is Maple ST over Crk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Maple ST over Crk carry?

About 150 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Maple ST over Crk?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.8 m) and a deck 24 ft wide.

Who owns Maple ST over Crk?

It is owned by the City or Municipal Highway Agency.