US Bridges

County RD 2025 over Trib of Clear CR

Good

Vernon County, Missouri · S 6 T 34 N R 30 W · Structure no. 34761

Built
2014
11 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
41 ft
1 main span
Daily traffic
1
2024 count
Owner
County
County Highway Agency

About this bridge

County RD 2025 over Trib of Clear CR is a steel stringer/multi-beam or girder carrying County RD 2025 over Trib of Clear CR in Vernon County, Missouri. It was built in 2014, so it is 11 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1 vehicles a day, roughly 10% of them trucks, projected to reach 1 by 2044. The structure is 41 ft (12.4 m) long and 23 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesCounty RD 2025
CrossesTrib of Clear CR
LocationS 6 T 34 N R 30 W
RouteCounty Highway 593
Coordinates37.73056, -94.27086
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.3 US tons
Inventory rating51.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length41 ft (12.4 m)
Longest span39 ft (11.9 m)
Deck width23 ft (6.9 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1 (2024)
Projected traffic1 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 2025 over Trib of Clear CR built?

It was built in 2014, making it 11 years old in 2025.

What condition is County RD 2025 over Trib of Clear CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does County RD 2025 over Trib of Clear CR carry?

About 1 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is County RD 2025 over Trib of Clear CR?

The structure is 41 ft (12.4 m) long with a longest span of 39 ft (11.9 m) and a deck 23 ft wide.

Who owns County RD 2025 over Trib of Clear CR?

It is owned by the County Highway Agency.