County RD Panama over Br W Fk of Clear C
GoodVernon County, Missouri · S 9 T 35 N R 30 W · Structure no. 24338
- Built
- 1940
- 85 years old, rebuilt 1991
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 39 ft
- 1 main span
- Daily traffic
- 20
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County RD Panama over Br W Fk of Clear C is a steel stringer/multi-beam or girder carrying County RD Panama over Br W Fk of Clear C in Vernon County, Missouri. It was built in 1940 and reconstructed in 1991, so it is 85 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 26 by 2044. The structure is 39 ft (11.9 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD Panama over Br W Fk of Clear C built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1991.
What condition is County RD Panama over Br W Fk of Clear C in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does County RD Panama over Br W Fk of Clear C carry?
About 20 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is County RD Panama over Br W Fk of Clear C?
The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 18 ft wide.
Who owns County RD Panama over Br W Fk of Clear C?
It is owned by the County Highway Agency.