US Bridges

County RD 125-160 over Trib of Shoal CR

Fair

Taney County, Missouri · S 25 T 22 N R 18 W · Structure no. 34423

Built
2012
13 years old
Condition
Fair
inspected February 2025
Type
Slab
Concrete
Length
80 ft
2 main spans
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

County RD 125-160 over Trib of Shoal CR is a concrete slab carrying County RD 125-160 over Trib of Shoal CR in Taney County, Missouri. It was built in 2012, so it is 13 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 100 by 2043. The structure is 80 ft (24.4 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCounty RD 125-160
CrossesTrib of Shoal CR
LocationS 25 T 22 N R 18 W
RouteCounty Highway 161
Coordinates36.55843, -92.8926
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating108.1 US tons
Inventory rating64.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadUnknown
Structure length80 ft (24.4 m)
Longest span38 ft (11.6 m)
Deck width25 ft (7.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic100 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 125-160 over Trib of Shoal CR built?

It was built in 2012, making it 13 years old in 2025.

What condition is County RD 125-160 over Trib of Shoal CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does County RD 125-160 over Trib of Shoal CR carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is County RD 125-160 over Trib of Shoal CR?

The structure is 80 ft (24.4 m) long with a longest span of 38 ft (11.6 m) and a deck 25 ft wide.

Who owns County RD 125-160 over Trib of Shoal CR?

It is owned by the County Highway Agency.