US Bridges

Denver DR over Trib Lit E Locust

Fair

Sullivan County, Missouri · S 27 T 61 N R 20 W · Structure no. 31829

Built
2006
19 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
111 ft
3 main spans
Daily traffic
15
2024 count
Owner
County
County Highway Agency

About this bridge

Denver DR over Trib Lit E Locust is a steel continuous stringer/multi-beam or girder carrying Denver DR over Trib Lit E Locust in Sullivan County, Missouri. It was built in 2006, so it is 19 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 17 by 2044. The structure is 111 ft (33.8 m) long and 21 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesDenver DR
CrossesTrib Lit E Locust
LocationS 27 T 61 N R 20 W
RouteCounty Highway 409
Coordinates40.06527, -93.12915
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating70.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length111 ft (33.8 m)
Longest span35 ft (10.7 m)
Deck width21 ft (6.4 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2024)
Projected traffic17 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Denver DR over Trib Lit E Locust built?

It was built in 2006, making it 19 years old in 2025.

What condition is Denver DR over Trib Lit E Locust in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Denver DR over Trib Lit E Locust carry?

About 15 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Denver DR over Trib Lit E Locust?

The structure is 111 ft (33.8 m) long with a longest span of 35 ft (10.7 m) and a deck 21 ft wide.

Who owns Denver DR over Trib Lit E Locust?

It is owned by the County Highway Agency.