US Bridges

Rt T E over S Fk Mid Fabius Rv

Good

Scotland County, Missouri · S 14 T 64 N R 13 W · Structure no. 36969

Built
2023
2 years old
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
144 ft
3 main spans
Daily traffic
206
2024 count
Owner
State
State Highway Agency

About this bridge

Rt T E over S Fk Mid Fabius Rv is a prestressed concrete continuous tee beam carrying Rt T E over S Fk Mid Fabius Rv in Scotland County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 206 vehicles a day, roughly 17% of them trucks, projected to reach 299 by 2044. The structure is 144 ft (43.8 m) long and 27 ft wide. If it were closed, the detour would be 29.8 mi (48 km).

CarriesRt T E
CrossesS Fk Mid Fabius Rv
LocationS 14 T 64 N R 13 W
RouteState Highway 0T
Coordinates40.34918, -92.32379
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.5 US tons
Inventory rating31.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length144 ft (43.8 m)
Longest span144 ft (43.8 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic206 (2024)
Projected traffic299 by 2044
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.8 mi (48 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt T E over S Fk Mid Fabius Rv built?

It was built in 2023, making it 2 years old in 2025.

What condition is Rt T E over S Fk Mid Fabius Rv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Rt T E over S Fk Mid Fabius Rv carry?

About 206 vehicles per day (2024 count), of which roughly 17% are trucks.

How long is Rt T E over S Fk Mid Fabius Rv?

The structure is 144 ft (43.8 m) long with a longest span of 144 ft (43.8 m) and a deck 27 ft wide.

Who owns Rt T E over S Fk Mid Fabius Rv?

It is owned by the State Highway Agency.