US Bridges

County Road 270 over Tobin CR

Good

Scotland County, Missouri · S 3 T 64 N R 12 W · Structure no. 21057

Built
1988
37 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
35
2024 count
Owner
County
County Highway Agency

About this bridge

County Road 270 over Tobin CR is a concrete culvert carrying County Road 270 over Tobin CR in Scotland County, Missouri. It was built in 1988, so it is 37 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35 vehicles a day, roughly 10% of them trucks, projected to reach 44 by 2044. The structure is 31 ft (9.4 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCounty Road 270
CrossesTobin CR
LocationS 3 T 64 N R 12 W
RouteCounty Highway 287
Coordinates40.38794, -92.22039
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.6 US tons
Inventory rating24.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 20
Structure length31 ft (9.4 m)
Longest span14 ft (4.3 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2024)
Projected traffic44 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 270 over Tobin CR built?

It was built in 1988, making it 37 years old in 2025.

What condition is County Road 270 over Tobin CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does County Road 270 over Tobin CR carry?

About 35 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is County Road 270 over Tobin CR?

The structure is 31 ft (9.4 m) long with a longest span of 14 ft (4.3 m) and a deck 24 ft wide.

Who owns County Road 270 over Tobin CR?

It is owned by the County Highway Agency.