US Bridges

Rt M S over Fabius Rvr

Fair

Schuyler County, Missouri · S 27 T 67 N R 15 W · Structure no. 7659

Built
1954
71 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
44
2024 count
Owner
State
State Highway Agency

About this bridge

Rt M S over Fabius Rvr is a concrete continuous culvert carrying Rt M S over Fabius Rvr in Schuyler County, Missouri. It was built in 1954, so it is 71 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 44 vehicles a day, roughly 9% of them trucks, projected to reach 55 by 2044. The structure is 25 ft (7.7 m) long and 22 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesRt M S
CrossesFabius Rvr
LocationS 27 T 67 N R 15 W
RouteState Highway 0M
Coordinates40.58114, -92.57817
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.6 US tons
Inventory rating27.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadH 10
Structure length25 ft (7.7 m)
Longest span10 ft (3 m)
Deck width22 ft (6.7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44 (2024)
Projected traffic55 by 2044
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt M S over Fabius Rvr built?

It was built in 1954, making it 71 years old in 2025.

What condition is Rt M S over Fabius Rvr in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Rt M S over Fabius Rvr carry?

About 44 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Rt M S over Fabius Rvr?

The structure is 25 ft (7.7 m) long with a longest span of 10 ft (3 m) and a deck 22 ft wide.

Who owns Rt M S over Fabius Rvr?

It is owned by the State Highway Agency.