US Bridges

Rt E E over N Fk S Fabius Rvr

Good

Schuyler County, Missouri · S 29 T 65 N R 14 W · Structure no. 36782

Built
2022
3 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
106 ft
3 main spans
Daily traffic
130
2024 count
Owner
State
State Highway Agency

About this bridge

Rt E E over N Fk S Fabius Rvr is a steel continuous stringer/multi-beam or girder carrying Rt E E over N Fk S Fabius Rvr in Schuyler County, Missouri. It was built in 2022, so it is 3 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 130 vehicles a day, roughly 9% of them trucks, projected to reach 163 by 2044. The structure is 106 ft (32.3 m) long and 27 ft wide. If it were closed, the detour would be 19.3 mi (31 km).

CarriesRt E E
CrossesN Fk S Fabius Rvr
LocationS 29 T 65 N R 14 W
RouteState Highway 0E
Coordinates40.40344, -92.48972
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.4 US tons
Inventory rating44.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length106 ft (32.3 m)
Longest span42 ft (12.8 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic130 (2024)
Projected traffic163 by 2044
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt E E over N Fk S Fabius Rvr built?

It was built in 2022, making it 3 years old in 2025.

What condition is Rt E E over N Fk S Fabius Rvr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Rt E E over N Fk S Fabius Rvr carry?

About 130 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Rt E E over N Fk S Fabius Rvr?

The structure is 106 ft (32.3 m) long with a longest span of 42 ft (12.8 m) and a deck 27 ft wide.

Who owns Rt E E over N Fk S Fabius Rvr?

It is owned by the State Highway Agency.