US Bridges

Rt C E over S. Fork N. Fabius

Good

Schuyler County, Missouri · S 5 T 66 N R 14 W · Structure no. 34640

Built
2014
11 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
144 ft
3 main spans
Daily traffic
304
2024 count
Owner
State
State Highway Agency

About this bridge

Rt C E over S. Fork N. Fabius is a prestressed concrete continuous stringer/multi-beam or girder carrying Rt C E over S. Fork N. Fabius in Schuyler County, Missouri. It was built in 2014, so it is 11 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 304 vehicles a day, roughly 12% of them trucks, projected to reach 380 by 2044. The structure is 144 ft (44 m) long and 27 ft wide. If it were closed, the detour would be 14.9 mi (24 km).

CarriesRt C E
CrossesS. Fork N. Fabius
LocationS 5 T 66 N R 14 W
RouteState Highway 0C
Coordinates40.55194, -92.48545
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length144 ft (44 m)
Longest span59 ft (18 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic304 (2024)
Projected traffic380 by 2044
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt C E over S. Fork N. Fabius built?

It was built in 2014, making it 11 years old in 2025.

What condition is Rt C E over S. Fork N. Fabius in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Rt C E over S. Fork N. Fabius carry?

About 304 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is Rt C E over S. Fork N. Fabius?

The structure is 144 ft (44 m) long with a longest span of 59 ft (18 m) and a deck 27 ft wide.

Who owns Rt C E over S. Fork N. Fabius?

It is owned by the State Highway Agency.