Rp Missouri Bottom over Mo 370 N&w RR
PoorSt. Louis County, Missouri · S 2039 T 46 N R 5 E · Structure no. 3990
- Built
- 1990
- 35 years old
- Condition
- Poor
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 290 ft
- 3 main spans
- Daily traffic
- 4,601
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rp Missouri Bottom over Mo 370 N&w RR is a steel continuous stringer/multi-beam or girder carrying Rp Missouri Bottom over Mo 370 N&w RR in St. Louis County, Missouri. It was built in 1990, so it is 35 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 4,601 vehicles a day, roughly 7% of them trucks, projected to reach 5,751 by 2044. The structure is 290 ft (88.4 m) long and 41 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rp Missouri Bottom over Mo 370 N&w RR built?
It was built in 1990, making it 35 years old in 2025.
What condition is Rp Missouri Bottom over Mo 370 N&w RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does Rp Missouri Bottom over Mo 370 N&w RR carry?
About 4,601 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Rp Missouri Bottom over Mo 370 N&w RR?
The structure is 290 ft (88.4 m) long with a longest span of 114 ft (34.7 m) and a deck 41 ft wide.
Who owns Rp Missouri Bottom over Mo 370 N&w RR?
It is owned by the State Highway Agency.