US Bridges

Longview Drive over Trib of Mattese

Good

St. Louis County, Missouri · S 34 T 43 N R 6 E · Structure no. 37063

Built
2023
2 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
20 ft
1 main span
Daily traffic
1,150
2023 count
Owner
County
County Highway Agency

About this bridge

Longview Drive over Trib of Mattese is a concrete culvert carrying Longview Drive over Trib of Mattese in St. Louis County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,150 vehicles a day, roughly 4% of them trucks, projected to reach 1,553 by 2043. The structure is 20 ft (6.1 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLongview Drive
CrossesTrib of Mattese
LocationS 34 T 43 N R 6 E
RouteCounty Highway 0
Coordinates38.497, -90.34158
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length20 ft (6.1 m)
Longest span20 ft (6.1 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,150 (2023)
Projected traffic1,553 by 2043
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Longview Drive over Trib of Mattese built?

It was built in 2023, making it 2 years old in 2025.

What condition is Longview Drive over Trib of Mattese in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Longview Drive over Trib of Mattese carry?

About 1,150 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Longview Drive over Trib of Mattese?

The structure is 20 ft (6.1 m) long with a longest span of 20 ft (6.1 m) and a deck 24 ft wide.

Who owns Longview Drive over Trib of Mattese?

It is owned by the County Highway Agency.