Geraldine Ave over Coldwater Creek
GoodPosted for loadSt. Louis County, Missouri · S 17 T 46 N R 6 E · Structure no. 36706
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected December 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 1,500
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Geraldine Ave over Coldwater Creek is a prestressed concrete box beam or girders - single or spread carrying Geraldine Ave over Coldwater Creek in St. Louis County, Missouri. It was built in 2022, so it is 3 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 1,500 vehicles a day, roughly 1% of them trucks, projected to reach 2,025 by 2044. The structure is 44 ft (13.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Geraldine Ave over Coldwater Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is Geraldine Ave over Coldwater Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Geraldine Ave over Coldwater Creek carry?
About 1,500 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Geraldine Ave over Coldwater Creek?
The structure is 44 ft (13.4 m) long with a longest span of 39 ft (11.9 m) and a deck 36 ft wide.
Who owns Geraldine Ave over Coldwater Creek?
It is owned by the City or Municipal Highway Agency.