US Bridges

Brasher ST over Drainage Channel

Fair

St. Louis County, Missouri · S 368 T 45 N R 3 E · Structure no. 35209

Built
2015
10 years old
Condition
Fair
inspected December 2023
Type
Culvert
Concrete
Length
23 ft
3 main spans
Daily traffic
500
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Brasher ST over Drainage Channel is a concrete culvert carrying Brasher ST over Drainage Channel in St. Louis County, Missouri. It was built in 2015, so it is 10 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 675 by 2043. The structure is 23 ft (7 m) long.

CarriesBrasher ST
CrossesDrainage Channel
LocationS 368 T 45 N R 3 E
RouteCity Street 0
Coordinates38.67342, -90.66103
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.7 US tons
Inventory rating24.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length23 ft (7 m)
Longest span7 ft (2.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2023)
Projected traffic675 by 2043
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Brasher ST over Drainage Channel built?

It was built in 2015, making it 10 years old in 2025.

What condition is Brasher ST over Drainage Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Brasher ST over Drainage Channel carry?

About 500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Brasher ST over Drainage Channel?

The structure is 23 ft (7 m) long with a longest span of 7 ft (2.1 m).

Who owns Brasher ST over Drainage Channel?

It is owned by the City or Municipal Highway Agency.