US Bridges

S Mcknight RD S over Is 64

Good

St. Louis County, Missouri · S 20 T 45 N R 6 E · Structure no. 32225

Built
2008
17 years old
Condition
Good
inspected October 2024
Type
Tee Beam
Prestressed Concrete
Length
146 ft
1 main span
Daily traffic
11,057
2024 count
Owner
State
State Highway Agency

About this bridge

S Mcknight RD S over Is 64 is a prestressed concrete tee beam carrying S Mcknight RD S over Is 64 in St. Louis County, Missouri. It was built in 2008, so it is 17 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,057 vehicles a day, roughly 5% of them trucks, projected to reach 15,480 by 2044. The structure is 146 ft (44.5 m) long and 60 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS Mcknight RD S
CrossesIs 64
LocationS 20 T 45 N R 6 E
RouteCity Street 0
Coordinates38.63004, -90.36227
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating43.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length146 ft (44.5 m)
Longest span72 ft (21.9 m)
Deck width60 ft (18.4 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,057 (2024)
Projected traffic15,480 by 2044
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S Mcknight RD S over Is 64 built?

It was built in 2008, making it 17 years old in 2025.

What condition is S Mcknight RD S over Is 64 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does S Mcknight RD S over Is 64 carry?

About 11,057 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is S Mcknight RD S over Is 64?

The structure is 146 ft (44.5 m) long with a longest span of 72 ft (21.9 m) and a deck 60 ft wide.

Who owns S Mcknight RD S over Is 64?

It is owned by the State Highway Agency.