Forest Park Pkwy W over Brentwood Blvd
GoodPosted for loadSt. Louis County, Missouri · S 16 T 45 N R 6 E · Structure no. 31788
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 107 ft
- 3 main spans
- Daily traffic
- 16,983
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Forest Park Pkwy W over Brentwood Blvd is a steel continuous stringer/multi-beam or girder carrying Forest Park Pkwy W over Brentwood Blvd in St. Louis County, Missouri. It was built in 2005, so it is 20 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 16,983 vehicles a day, roughly 5% of them trucks, projected to reach 22,927 by 2044. The structure is 107 ft (32.5 m) long and 41 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Forest Park Pkwy W over Brentwood Blvd built?
It was built in 2005, making it 20 years old in 2025.
What condition is Forest Park Pkwy W over Brentwood Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Forest Park Pkwy W over Brentwood Blvd carry?
About 16,983 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Forest Park Pkwy W over Brentwood Blvd?
The structure is 107 ft (32.5 m) long with a longest span of 107 ft (32.5 m) and a deck 41 ft wide.
Who owns Forest Park Pkwy W over Brentwood Blvd?
It is owned by the County Highway Agency.