US Bridges

Mo 115 S over Metrolink WB Metrolink

Good

St. Louis County, Missouri · S 23 T 46 N R 6 E · Structure no. 30141

Built
2004
21 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
93 ft
1 main span
Daily traffic
8,263
2024 count
Owner
State
State Highway Agency

About this bridge

Mo 115 S over Metrolink WB Metrolink is a prestressed concrete box beam or girders - multiple carrying Mo 115 S over Metrolink WB Metrolink in St. Louis County, Missouri. It was built in 2004, so it is 21 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,263 vehicles a day, roughly 9% of them trucks, projected to reach 11,568 by 2044. The structure is 93 ft (28.2 m) long and 83 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMo 115 S
CrossesMetrolink WB Metrolink
LocationS 23 T 46 N R 6 E
RouteState Highway 115
Coordinates38.707, -90.30537
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.4 US tons
Inventory rating48.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length93 ft (28.2 m)
Longest span69 ft (20.9 m)
Deck width83 ft (25.3 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,263 (2024)
Projected traffic11,568 by 2044
Trucks9%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mo 115 S over Metrolink WB Metrolink built?

It was built in 2004, making it 21 years old in 2025.

What condition is Mo 115 S over Metrolink WB Metrolink in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Mo 115 S over Metrolink WB Metrolink carry?

About 8,263 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Mo 115 S over Metrolink WB Metrolink?

The structure is 93 ft (28.2 m) long with a longest span of 69 ft (20.9 m) and a deck 83 ft wide.

Who owns Mo 115 S over Metrolink WB Metrolink?

It is owned by the State Highway Agency.