North Hanley RD over Wabash Ave BNSF RR Cre
FairPosted for loadSt. Louis County, Missouri · S 3 T 46 N R 6 E · Structure no. 15558
- Built
- 1974
- 51 years old, rebuilt 1996
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 408 ft
- 3 main spans
- Daily traffic
- 8,376
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
North Hanley RD over Wabash Ave BNSF RR Cre is a steel continuous stringer/multi-beam or girder carrying North Hanley RD over Wabash Ave BNSF RR Cre in St. Louis County, Missouri. It was built in 1974 and reconstructed in 1996, so it is 51 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 8,376 vehicles a day, roughly 10% of them trucks, projected to reach 11,308 by 2044. The structure is 408 ft (124.4 m) long and 74 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Hanley RD over Wabash Ave BNSF RR Cre built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1996.
What condition is North Hanley RD over Wabash Ave BNSF RR Cre in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does North Hanley RD over Wabash Ave BNSF RR Cre carry?
About 8,376 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is North Hanley RD over Wabash Ave BNSF RR Cre?
The structure is 408 ft (124.4 m) long with a longest span of 75 ft (22.9 m) and a deck 74 ft wide.
Who owns North Hanley RD over Wabash Ave BNSF RR Cre?
It is owned by the County Highway Agency.