County RD SW 1051 over Trib of Lit Clear
FairSt. Clair County, Missouri · S 2 T 36 N R 28 W · Structure no. 30301
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 40
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County RD SW 1051 over Trib of Lit Clear is a steel stringer/multi-beam or girder carrying County RD SW 1051 over Trib of Lit Clear in St. Clair County, Missouri. It was built in 2002, so it is 23 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40 vehicles a day, roughly 10% of them trucks, projected to reach 48 by 2043. The structure is 27 ft (8.2 m) long and 20 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD SW 1051 over Trib of Lit Clear built?
It was built in 2002, making it 23 years old in 2025.
What condition is County RD SW 1051 over Trib of Lit Clear in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does County RD SW 1051 over Trib of Lit Clear carry?
About 40 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is County RD SW 1051 over Trib of Lit Clear?
The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.9 m) and a deck 20 ft wide.
Who owns County RD SW 1051 over Trib of Lit Clear?
It is owned by the County Highway Agency.