US Bridges

David Hoekel Pkwy over Fountains CR

Good

St. Charles County, Missouri · S 21 T 47 N R 1 E · Structure no. 37422

Built
2024
1 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete
Length
49 ft
4 main spans
Daily traffic
1,000
2025 count
Owner
City
City or Municipal Highway Agency

About this bridge

David Hoekel Pkwy over Fountains CR is a concrete culvert carrying David Hoekel Pkwy over Fountains CR in St. Charles County, Missouri. It was built in 2024, so it is 1 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,550 by 2045. The structure is 49 ft (14.9 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesDavid Hoekel Pkwy
CrossesFountains CR
LocationS 21 T 47 N R 1 E
RouteCity Street 0
Coordinates38.81578, -90.91411
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.4 US tons
Inventory rating45.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length49 ft (14.9 m)
Longest span11 ft (3.5 m)
Deck width60 ft (18.3 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2025)
Projected traffic1,550 by 2045
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was David Hoekel Pkwy over Fountains CR built?

It was built in 2024, making it 1 years old in 2025.

What condition is David Hoekel Pkwy over Fountains CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does David Hoekel Pkwy over Fountains CR carry?

About 1,000 vehicles per day (2025 count), of which roughly 10% are trucks.

How long is David Hoekel Pkwy over Fountains CR?

The structure is 49 ft (14.9 m) long with a longest span of 11 ft (3.5 m) and a deck 60 ft wide.

Who owns David Hoekel Pkwy over Fountains CR?

It is owned by the City or Municipal Highway Agency.