US Bridges

Peine RD N over US 61 US 61

Good

St. Charles County, Missouri · S 413 T 47 N R 1 E · Structure no. 35613

Built
2018
7 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Prestressed Concrete
Length
218 ft
2 main spans
Daily traffic
8,430
2024 count
Owner
State
State Highway Agency

About this bridge

Peine RD N over US 61 US 61 is a prestressed concrete tee beam carrying Peine RD N over US 61 US 61 in St. Charles County, Missouri. It was built in 2018, so it is 7 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,430 vehicles a day, roughly 5% of them trucks, projected to reach 16,439 by 2044. The structure is 218 ft (66.3 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPeine RD N
CrossesUS 61 US 61
LocationS 413 T 47 N R 1 E
RouteCity Street 0
Coordinates38.855, -90.87139
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating82.3 US tons
Inventory rating27.8 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length218 ft (66.3 m)
Longest span114 ft (34.8 m)
Deck width57 ft (17.3 m)
Roadway width47 ft (14.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,430 (2024)
Projected traffic16,439 by 2044
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Peine RD N over US 61 US 61 built?

It was built in 2018, making it 7 years old in 2025.

What condition is Peine RD N over US 61 US 61 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Peine RD N over US 61 US 61 carry?

About 8,430 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Peine RD N over US 61 US 61?

The structure is 218 ft (66.3 m) long with a longest span of 114 ft (34.8 m) and a deck 57 ft wide.

Who owns Peine RD N over US 61 US 61?

It is owned by the State Highway Agency.