US Bridges

Silvercote DR over Spring Br

Fair

St. Charles County, Missouri · S 13 T 47 N R 1 E · Structure no. 35238

Built
1982
43 years old
Condition
Fair
inspected January 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
100
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Silvercote DR over Spring Br is a concrete culvert carrying Silvercote DR over Spring Br in St. Charles County, Missouri. It was built in 1982, so it is 43 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 155 by 2044. The structure is 29 ft (8.9 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSilvercote DR
CrossesSpring Br
LocationS 13 T 47 N R 1 E
RouteCity Street 0
Coordinates38.82694, -90.85
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length29 ft (8.9 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2024)
Projected traffic155 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Silvercote DR over Spring Br built?

It was built in 1982, making it 43 years old in 2025.

What condition is Silvercote DR over Spring Br in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Silvercote DR over Spring Br carry?

About 100 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Silvercote DR over Spring Br?

The structure is 29 ft (8.9 m) long with a longest span of 14 ft (4.3 m).

Who owns Silvercote DR over Spring Br?

It is owned by the City or Municipal Highway Agency.