Mo 364 W over Dardenne CR Bike Path
FairSt. Charles County, Missouri · S 15 T 46 N R 3 E · Structure no. 34600
- Built
- 2014
- 11 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 216 ft
- 2 main spans
- Daily traffic
- 22,855
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Mo 364 W over Dardenne CR Bike Path is a prestressed concrete continuous stringer/multi-beam or girder carrying Mo 364 W over Dardenne CR Bike Path in St. Charles County, Missouri. It was built in 2014, so it is 11 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,855 vehicles a day, roughly 5% of them trucks, projected to reach 38,854 by 2044. The structure is 216 ft (65.8 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mo 364 W over Dardenne CR Bike Path built?
It was built in 2014, making it 11 years old in 2025.
What condition is Mo 364 W over Dardenne CR Bike Path in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Mo 364 W over Dardenne CR Bike Path carry?
About 22,855 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Mo 364 W over Dardenne CR Bike Path?
The structure is 216 ft (65.8 m) long with a longest span of 106 ft (32.3 m) and a deck 35 ft wide.
Who owns Mo 364 W over Dardenne CR Bike Path?
It is owned by the State Highway Agency.