US Bridges

Mo 364 W over Crd Motherhead RD

Good

St. Charles County, Missouri · S 948 T 46 N R 3 E · Structure no. 34577

Built
2014
11 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
22,855
2024 count
Owner
State
State Highway Agency

About this bridge

Mo 364 W over Crd Motherhead RD is a prestressed concrete stringer/multi-beam or girder carrying Mo 364 W over Crd Motherhead RD in St. Charles County, Missouri. It was built in 2014, so it is 11 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,855 vehicles a day, roughly 5% of them trucks, projected to reach 38,854 by 2044. The structure is 75 ft (22.9 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMo 364 W
CrossesCrd Motherhead RD
LocationS 948 T 46 N R 3 E
RouteState Highway 364
Coordinates38.7338, -90.6503
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.4 US tons
Inventory rating45.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length75 ft (22.9 m)
Longest span71 ft (21.6 m)
Deck width41 ft (12.4 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,855 (2024)
Projected traffic38,854 by 2044
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mo 364 W over Crd Motherhead RD built?

It was built in 2014, making it 11 years old in 2025.

What condition is Mo 364 W over Crd Motherhead RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Mo 364 W over Crd Motherhead RD carry?

About 22,855 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Mo 364 W over Crd Motherhead RD?

The structure is 75 ft (22.9 m) long with a longest span of 71 ft (21.6 m) and a deck 41 ft wide.

Who owns Mo 364 W over Crd Motherhead RD?

It is owned by the State Highway Agency.