Rt P E over Peruque CR
FairSt. Charles County, Missouri · S 7 T 47 N R 8 E · Structure no. 3209
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 232 ft
- 3 main spans
- Daily traffic
- 8,470
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rt P E over Peruque CR is a prestressed concrete continuous stringer/multi-beam or girder carrying Rt P E over Peruque CR in St. Charles County, Missouri. It was built in 1983, so it is 42 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,470 vehicles a day, roughly 4% of them trucks, projected to reach 16,517 by 2044. The structure is 232 ft (70.7 m) long and 47 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rt P E over Peruque CR built?
It was built in 1983, making it 42 years old in 2025.
What condition is Rt P E over Peruque CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Rt P E over Peruque CR carry?
About 8,470 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Rt P E over Peruque CR?
The structure is 232 ft (70.7 m) long with a longest span of 77 ft (23.6 m) and a deck 47 ft wide.
Who owns Rt P E over Peruque CR?
It is owned by the State Highway Agency.