Becker Joerling RD over Trib of Femme Osag
FairSt. Charles County, Missouri · S 16 T 45 N R 1 E · Structure no. 22414
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 59 ft
- 1 main span
- Daily traffic
- 69
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Becker Joerling RD over Trib of Femme Osag is a steel stringer/multi-beam or girder carrying Becker Joerling RD over Trib of Femme Osag in St. Charles County, Missouri. It was built in 1991, so it is 34 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 69 vehicles a day, roughly 10% of them trucks, projected to reach 152 by 2044. The structure is 59 ft (18 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Becker Joerling RD over Trib of Femme Osag built?
It was built in 1991, making it 34 years old in 2025.
What condition is Becker Joerling RD over Trib of Femme Osag in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Becker Joerling RD over Trib of Femme Osag carry?
About 69 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Becker Joerling RD over Trib of Femme Osag?
The structure is 59 ft (18 m) long with a longest span of 56 ft (17.1 m) and a deck 31 ft wide.
Who owns Becker Joerling RD over Trib of Femme Osag?
It is owned by the County Highway Agency.