ST Paul RD over Trib of Peruque CR
PoorSt. Charles County, Missouri · S 1 T 47 N R 2 E · Structure no. 14068
- Built
- 1940
- 85 years old, rebuilt 2009
- Condition
- Poor
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 2 main spans
- Daily traffic
- 1,720
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
ST Paul RD over Trib of Peruque CR is a steel stringer/multi-beam or girder carrying ST Paul RD over Trib of Peruque CR in St. Charles County, Missouri. It was built in 1940 and reconstructed in 2009, so it is 85 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,720 vehicles a day, roughly 10% of them trucks, projected to reach 2,666 by 2044. The structure is 32 ft (9.8 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST Paul RD over Trib of Peruque CR built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 2009.
What condition is ST Paul RD over Trib of Peruque CR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does ST Paul RD over Trib of Peruque CR carry?
About 1,720 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is ST Paul RD over Trib of Peruque CR?
The structure is 32 ft (9.8 m) long with a longest span of 15 ft (4.7 m) and a deck 31 ft wide.
Who owns ST Paul RD over Trib of Peruque CR?
It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.