Ginger Trail over Br to Chariton Rvr
FairClosed to trafficPutnam County, Missouri · S 28 T 65 N R 16 W · Structure no. 21536
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 48 ft
- 1 main span
- Daily traffic
- 40
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Ginger Trail over Br to Chariton Rvr is a steel stringer/multi-beam or girder carrying Ginger Trail over Br to Chariton Rvr in Putnam County, Missouri. It was built in 1987, so it is 38 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.
It carries about 40 vehicles a day, roughly 10% of them trucks, projected to reach 44 by 2044. The structure is 48 ft (14.6 m) long and 16 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ginger Trail over Br to Chariton Rvr built?
It was built in 1987, making it 38 years old in 2025.
What condition is Ginger Trail over Br to Chariton Rvr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Ginger Trail over Br to Chariton Rvr carry?
About 40 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Ginger Trail over Br to Chariton Rvr?
The structure is 48 ft (14.6 m) long with a longest span of 48 ft (14.6 m) and a deck 16 ft wide.
Who owns Ginger Trail over Br to Chariton Rvr?
It is owned by the County Highway Agency.