Orchid Trail over Lick CR
FairPutnam County, Missouri · S 16 T 65 N R 17 W · Structure no. 20862
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 39 ft
- 1 main span
- Daily traffic
- 5
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Orchid Trail over Lick CR is a steel stringer/multi-beam or girder carrying Orchid Trail over Lick CR in Putnam County, Missouri. It was built in 1993, so it is 32 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5 vehicles a day, roughly 10% of them trucks, projected to reach 6 by 2044. The structure is 39 ft (11.9 m) long and 18 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Orchid Trail over Lick CR built?
It was built in 1993, making it 32 years old in 2025.
What condition is Orchid Trail over Lick CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Orchid Trail over Lick CR carry?
About 5 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Orchid Trail over Lick CR?
The structure is 39 ft (11.9 m) long with a longest span of 38 ft (11.6 m) and a deck 18 ft wide.
Who owns Orchid Trail over Lick CR?
It is owned by the County Highway Agency.