US Bridges

Rt P S over Hominy CR

Good

Polk County, Missouri · S 32 T 34 N R 21 W · Structure no. 31517

Built
2006
19 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
146 ft
3 main spans
Daily traffic
708
2024 count
Owner
State
State Highway Agency

About this bridge

Rt P S over Hominy CR is a prestressed concrete continuous stringer/multi-beam or girder carrying Rt P S over Hominy CR in Polk County, Missouri. It was built in 2006, so it is 19 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 708 vehicles a day, roughly 7% of them trucks, projected to reach 1,133 by 2044. The structure is 146 ft (44.5 m) long and 31 ft wide. If it were closed, the detour would be 26.1 mi (42 km).

CarriesRt P S
CrossesHominy CR
LocationS 32 T 34 N R 21 W
RouteState Highway 0P
Coordinates37.63595, -93.24915
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.3 US tons
Inventory rating54.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length146 ft (44.5 m)
Longest span53 ft (16.2 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic708 (2024)
Projected traffic1,133 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.1 mi (42 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt P S over Hominy CR built?

It was built in 2006, making it 19 years old in 2025.

What condition is Rt P S over Hominy CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Rt P S over Hominy CR carry?

About 708 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Rt P S over Hominy CR?

The structure is 146 ft (44.5 m) long with a longest span of 53 ft (16.2 m) and a deck 31 ft wide.

Who owns Rt P S over Hominy CR?

It is owned by the State Highway Agency.