County RD S-145 over Br of Piper CR
FairPolk County, Missouri · S 17 T 33 N R 22 W · Structure no. 22141
- Built
- 1900
- 125 years old
- Condition
- Fair
- inspected April 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 41 ft
- 1 main span
- Daily traffic
- 100
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County RD S-145 over Br of Piper CR is a steel girder and floorbeam system carrying County RD S-145 over Br of Piper CR in Polk County, Missouri. It was built in 1900, so it is 125 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 145 by 2044. The structure is 41 ft (12.5 m) long and 22 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD S-145 over Br of Piper CR built?
It was built in 1900, making it 125 years old in 2025.
What condition is County RD S-145 over Br of Piper CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does County RD S-145 over Br of Piper CR carry?
About 100 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is County RD S-145 over Br of Piper CR?
The structure is 41 ft (12.5 m) long with a longest span of 39 ft (11.9 m) and a deck 22 ft wide.
Who owns County RD S-145 over Br of Piper CR?
It is owned by the County Highway Agency.